MITSUBISHI motor produced PLC connection cable.
Size: A, 1000mm; B, 750mm.
Output use.
Connector cable, MITSUBISHI motor produced PLC connection cable.
Shape: DIP straight terminal.
Pole number: 50.
Pole pole number: 2.
Minimum packing unit: 30.
Printed board connector core, MIL specification standard.
Through the use of new productivity design, high reliability and low price synchronization.
A box type plug (XG4C) which is convenient for saving space is provided in the province OMRON G79-O100C-75-MN.
A press type plug (XG4E) capable of using the relay is provided
G79-O100C-75-MN
Will be the company''s loose wire connector (XG5) - specific plug (XG8) and PCB type.
(XG2) combined use of various types of packaging can be achieved.
Suitable for the company''s own development of a simple locking lever can make the unique plug (XG8) and,
Box type plugs (XG4C) can also be locked.
MIL specification (MIL-C-83503) standard OMRON G79-O100C-75-MN.
Standard product conforms to the UL specification (No. E103202 File) certified products. Display contents: Unit.
Display color: Green.
Type: --.
Zero Suppression Incorporated.
Single-color (red or green) and two-color (red or green,
selectable) displays with a character height of 25 mm are,
available for a variety of applications and locations.
Miniature design with a 43-mm depth is perfect for saving,
space in equipment and devices OMRON G79-O100C-75-MN.
A wide power supply range from 12 to 24 VDC.
Connectors are available, which allows easy maintenance.
Negative logic input. Time specification: Inverse type.
Current setting range: 8 to 26 A.
Operating voltage: 200/220/240 VAC.
Resetting method: Manual.
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easily because operation time,
is indiccated from the start of operation G79-O100C-75-MN.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequency, basic,
frequency, and load conditions G79-O100C-75-MN. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
before using the K2CM.