OMRON
Home >> Download >> OMRON >> Manual Download >> OMRON K3HB-SSD-L1AT11 Manual K3HB-SSD-L1AT11 User's Manual

OMRON K3HB-SSD-L1AT11 Manual K3HB-SSD-L1AT11 User's Manual

Brand: OMRON
Product model: K3HB-SSD-L1AT11
Name: Digital Temperature Controllers
Sort: User's Manual
File language: English
File size: 2.07MB
Detect errors in motors and other equipment,
through current changes.
Use in either overcurrent or undercurrent mode.
Monitor AC or DC currents with one Relay.
Use with commercially available CTs (CT secondary side: 0 to 1 A or 0 to 5 A).
Settings for the operating value, hysteresis, startup lock time,
and operating time K3HB-SSD-L1AT11 User's Manual.
Width of 17.5 mm to reduce space required in panels K3HB-SSD-L1AT11
Push-In Plus Terminal that reduce wiring work.
The use of cage clamps enables wiring with bare stranded wires.
Double-insertion holes for crossover wiring (all terminals).
UL listed for easy shipping to North America.
Models added with transistor outputs for superior contact reliability. Ideal for Monitoring 3-phase Power Supplies K3HB-SSD-L1AT11 User's Manual.
for Industrial Facilities and Equipment.
Greater resistance to inverter noise.
Monitor undervoltages, phase sequence, and phase loss in three,
phase three-wire circuits with one unit.
One SPDT output relay, 5 A at 250 VAC (resistive load).
World-wide power specifications supported by one unit.
(Set with a rotary switch.).
Relay status can be monitored using LED indicator K3HB-SSD-L1AT11 User's Manual. Time specification: Inverse type.
Current setting range: 8 to 26 A.
Operating voltage: 200/220/240 VAC.
Resetting method: Manual.
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easily because operationn time,
is indicated from the start of operation K3HB-SSD-L1AT11 Manual.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequeency, basic,
frequency, and load conditions K3HB-SSD-L1AT11 Manual. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
Related products