OMRON
Home >> Price >> OMRON >> D4SL-NSK10-LK Pirce
Brand sort

OMRON D4SL-NSK10-LK Pirce

No PHOTO
Brand: OMRON
Country: JAPAN
Name:
Market price: U.S.$ 380.06
(The following are the market open price not sales price!)
OMRON D4SL-NSK10-LK
Output: DPDT.
Lighting: LED.
Operating voltage: 12 VAC/VDC.
Pushbutton colorsymbol: R: red, Y: yellow; PY: pure yellow
G: green, A: blue; PW: pure white; B: black *2.
Item: Momentary operation (Self-resetting).
Separate Construction with.
Cylindrical 16-dia. Body.
Miniature design of 28.5 mm, the smallest class in the industry.
Detachable Switch.
The same contacts can be used for both standard loads and microloads D4SL-NSK10-LK
Easy-to-wire terminal arrangement.
Certified for EN 60947-5-1. Output: DPDT.
Lighting: LED (with built-in reduced-voltage lighting function).
Operating voltage: 100/110 VAC/VDC.
Pushbutton colorsymbol: R: red, Y: yellow; PY: pure yellow
G: green, A: blue; W: white; PW: pure white.
Item: Alternate operation (Self-holding).
Separate Construction with.
Cylindrical 16-dia. Body.
Miniature design of 28.5 mm, the smallest class in the industry.
Detachable Switch.
The same contacts can be used for both standard loads and microloads.
Easy-to-wire terminal arrangement.
Certified for EN 60947-5-1. CV500-VP CPU Bus Unit Personal Computer Unit Main Mem CV500-VP223-E.
4-MB memory; w/floating-point processor.Time specification: Inverse type.
Current setting range: 8 to 26 A.
Operating voltage: 200/220/240 VAC.
Resetting method: Automatic (See note.).
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easily because operation time,
is indicated from the start of operation.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequency, basic,
frequency, and load conditions. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
before using the K2CM.
D4SL-NSK10-LK Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=D4SL-NSK10-LK&select=5


...more relevant model market price >>>>